Date: October 5, 2016 To: Joan Davies City Administrator From: David Buckwald & Rick McClung Re: September 2016 Public Works Report Produced: 4,832,000 Gallons of Drinking Water Treated: 3,445,000 Gallons of Wastewater Department Subject Description Streets Signs Repaired broken street sign on Black Stone. Streets Road Mtc. Bladed Rock Drive, Cape View Drive 450 ft. and Shellmidden Streets Storm Drain Mtc. Repaired storm drain at 56 Green Hill Drive. Trails Brush Brush removal Picked up seven loads of brush and put in brush box. Also picked up three piles of brush left outside the gate. CIP -Water Looping Project Will be complete in about a week CIP -Water South Reservoir Geotech has drilled the holes and we are waiting for the report CIP Streets Hwy 101 Work has begun. Hydro-excavating to find locations of all utilities. Water Water Plant Mtc. Repaired Filter #1Cla-Valve at water plant. Water Salmon Creek Drain Cleaned debris from the Salmon Creek catch basin at the water plant. Water Meter Mtc. Brushed meters. Painted meter location marks on pavement. Public Works Fill Site Hauled 20 yards of fill dirt to the City’s fill site. Library Gutters Cleaned gutters at the Library. Sewer Wastewater Surcharge Continued research on equitable rate charge for wastewater “stronger than normal”. In the process of forming an Advisory Group. Sewer Manhole repairs Repaired/resealed lid Riverside Pump Station Contracted repairs on three leaking manholes. Repairs complete. Sewer F.O.G. Grease removal 9 man-hours to remove grease from three manholes and clean 900 feet of sewer main. Sewer WWTP Building UV hoist structure in UV building. This will enable operator to remove UV lights alone. Building cat walk over digesters to enable safe removal of gear box for annual mtc. Sewer Biosolids 56,473 gallons of biosolids were processed to make one truck load to Roseburg. Approx. 29 cans of digester grit sent to the land fill. Sewer/Water Weekly meetings Met with City Administrator. 2 1